Difference between revisions of "Significant Deficiency"

From Knowledge base
Jump to: navigation, search
Line 3: Line 3:
 
==Links==
 
==Links==
 
[[DFAR 252.215-7002 Cost Estimating System Requirements]]
 
[[DFAR 252.215-7002 Cost Estimating System Requirements]]
 +
 
[[Estimating System]]
 
[[Estimating System]]
  

Revision as of 20:52, 19 September 2013

“Significant deficiency” means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon information produced by the system that is needed for management purposes.[1]

Links

DFAR 252.215-7002 Cost Estimating System Requirements

Estimating System

References and Notes

  1. DFAR 252.215-7002