Difference between revisions of "Significant Deficiency"
From Knowledge base
Line 3: | Line 3: | ||
==Links== | ==Links== | ||
[[DFAR 252.215-7002 Cost Estimating System Requirements]] | [[DFAR 252.215-7002 Cost Estimating System Requirements]] | ||
+ | |||
[[Estimating System]] | [[Estimating System]] | ||
Revision as of 20:52, 19 September 2013
“Significant deficiency” means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon information produced by the system that is needed for management purposes.[1]
Links
DFAR 252.215-7002 Cost Estimating System Requirements
References and Notes
- ↑ DFAR 252.215-7002