Difference between revisions of "Final Cost Objective"
From Knowledge base
(→Related Pages) |
|||
Line 1: | Line 1: | ||
− | Final cost objective means a cost objective which has allocated to it both direct and indirect costs, and, in the contractor's accumulation systems, is one of the final accumulation points.<ref>CAS 410, April 17, 1992</ref> | + | '''Final cost objective''' means a cost objective which has allocated to it both direct and indirect costs, and, in the contractor's accumulation systems, is one of the final accumulation points.<ref>CAS 410, April 17, 1992</ref> |
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<References/> | <References/> | ||
− | + | ||
[[Category:Definitions]] | [[Category:Definitions]] |
Latest revision as of 12:17, 31 March 2015
Final cost objective means a cost objective which has allocated to it both direct and indirect costs, and, in the contractor's accumulation systems, is one of the final accumulation points.[1]
References
- ↑ CAS 410, April 17, 1992