==Statutory Fee Limitations<ref>FAR 15.404-4(c)(4)(i)</ref>
+
==Statutory Fee Limitations<ref>FAR 15.404-4(c)(4)(i)</ref>==
  
 
(The contracting officer shall not negotiate a price or fee that exceeds the following statutory limitations, imposed by 10 U.S.C. 2306(d) and 41 U.S.C. 254(b):  
 
(The contracting officer shall not negotiate a price or fee that exceeds the following statutory limitations, imposed by 10 U.S.C. 2306(d) and 41 U.S.C. 254(b):  
Line 5: Line 5:
 
*(A) For '''experimental, developmental, or research work''' performed under a '''cost-plus-fixed-fee''' contract, the fee '''shall not exceed 15 percent''' of the contract’s estimated cost, excluding fee.  
 
*(A) For '''experimental, developmental, or research work''' performed under a '''cost-plus-fixed-fee''' contract, the fee '''shall not exceed 15 percent''' of the contract’s estimated cost, excluding fee.  
  
(B) For '''architect-engineer services for public works or utilities''', the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications '''shall not exceed 6 percent''' of the estimated cost of construction of the public work or utility, excluding fees.
 
  
(C) '''For other cost-plus-fixed-fee contracts''', the fee '''shall not exceed 10 percent''' of the contract’s estimated cost, excluding fee.  
+
*(B) For '''architect-engineer services for public works or utilities''', the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications '''shall not exceed 6 percent''' of the estimated cost of construction of the public work or utility, excluding fees.
 +
 
 +
 
 +
*(C) '''For other cost-plus-fixed-fee contracts''', the fee '''shall not exceed 10 percent''' of the contract’s estimated cost, excluding fee.  
  
 
The contracting officer’s signature on the price negotiation memorandum or other documentation supporting determination of fair and reasonable price documents the contracting officer’s determination that the statutory price or fee limitations have not been exceeded.  
 
The contracting officer’s signature on the price negotiation memorandum or other documentation supporting determination of fair and reasonable price documents the contracting officer’s determination that the statutory price or fee limitations have not been exceeded.  

Latest revision as of 11:36, 23 October 2013

Statutory Fee Limitations[1]

(The contracting officer shall not negotiate a price or fee that exceeds the following statutory limitations, imposed by 10 U.S.C. 2306(d) and 41 U.S.C. 254(b):

  • (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee contract, the fee shall not exceed 15 percent of the contract’s estimated cost, excluding fee.


  • (B) For architect-engineer services for public works or utilities, the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated cost of construction of the public work or utility, excluding fees.


  • (C) For other cost-plus-fixed-fee contracts, the fee shall not exceed 10 percent of the contract’s estimated cost, excluding fee.

The contracting officer’s signature on the price negotiation memorandum or other documentation supporting determination of fair and reasonable price documents the contracting officer’s determination that the statutory price or fee limitations have not been exceeded.

References and Notes

  1. FAR 15.404-4(c)(4)(i)